Description
Package includes: Adjustable harness + 160cm leash lead + Adjustable Collar. Perfect set convenient and safe for walking, running, training, and simply playing Durable rope to make this a long-lasting leash so you and your dog can enjoy years of walks together. Super long leash, 63. High visible color for safe Nylon braided harness, leash and collar, extremely strong and durable, for heavy duty work to support puppy’s body safely and comfortably. The dog leash and non-pull collar/ harness make your life easier while running/ walking with your dog Ergonomic designed and well made handle/ hand loop, soft on hands, easy to grip and wear-resistant. The clip easily attach to the collar/ harness and quick release The metal part of the set, made of premium zinc alloy with chrome plating, long lasting to use and anti-rust. The set is easy to control your dog & make them come along, without the harness slipping off the shoulders Size Name:M, Chest: 21.5-27.5 | Colour Name:Black Harness + Leash

Reviews
There are no reviews yet.